Turnkey Solution for New Energy Intelligent Equipment
The EV Cylindrical Battery Module PACK Assembly Line is a state-of-the-art automated system designed for assembling cylindrical battery cells into modules and complete PACKs. It encompasses cell sorting, welding, module stacking, PACK integration, and comprehensive testing, ensuring high efficiency, precision, and safety for EV battery manufacturing.
Categories: Lithium Battery PACK Assembly REQUEST FOR QUOTE > TURN BACKThe EV Cylindrical Battery Module PACK Assembly Line is a state-of-the-art automated system designed for assembling cylindrical battery cells into modules and complete PACKs. It encompasses cell sorting, welding, module stacking, PACK integration, and comprehensive testing, ensuring high efficiency, precision, and safety for EV battery manufacturing.
2.1 Battery Cell Sorting Station
Function: Sorts cylindrical cells based on voltage, internal resistance, and capacity to ensure balanced modules.
Specifications:
Sorting Accuracy: ±1 mV (voltage), ±0.1 mΩ (resistance).
Sorting Throughput: 150 cells/hour.
2.2 Cell Grouping and Holder Insertion
Function: Groups cells based on sorting data and inserts them into plastic or metal holders.
Specifications:
Cell Diameter Range: 18–46 mm.
Holder Positioning Accuracy: ±0.1 mm.
Cycle Time: ≤5 seconds per cell.
2.3 Busbar Placement and Welding
Function: Places busbars on cell terminals and welds them for electrical connections.
Specifications:
Welding Method: Ultrasonic or laser welding.
Welding Power: 300–500 W (laser), 20 kHz (ultrasonic).
Welding Accuracy: ±0.05 mm.
Welding Speed: ≤5 seconds per weld.
2.4 Module Stacking and Frame Assembly
Function: Stacks modules and assembles them into structural frames.
Specifications:
Module Size Range:
Length: 200–600 mm.
Width: 150–300 mm.
Height: 50–150 mm.
Stacking Accuracy: ±0.2 mm.
Cycle Time: ≤15 seconds per module.
2.5 Cooling Plate and Thermal Interface Material (TIM) Application
Function: Installs cooling plates and applies TIM for thermal management.
Specifications:
TIM Application Accuracy: ±0.1 mm.
Cooling Plate Compatibility: Aluminum, copper.
Cycle Time: ≤20 seconds per module.
2.6 PACK Assembly and Integration
Function: Integrates modules into the battery PACK, including high-voltage connectors and housing.
Specifications:
PACK Size Range:
Length: 600–1200 mm.
Width: 400–800 mm.
Height: 150–500 mm.
Positioning Accuracy: ±0.3 mm.
Cycle Time: ≤120 seconds per PACK.
2.7 Final Testing and Inspection
Function: Conducts comprehensive electrical and safety tests on the final PACK.
Specifications:
Test Parameters: Voltage, current, insulation resistance, short-circuit protection, and helium leak detection.
Testing Speed: ≤2 minutes per PACK.
Pass/Fail Criteria: Programmable through the central control system.
Overall Dimensions:
Length: 60,000 mm.
Width: 10,000 mm.
Height: 3,500 mm.
Weight: Approximately 30,000 kg.
Production Capacity: Up to 25 PACKs/hour.
Automation Level: Fully automated with robotic systems.
Alignment Cameras:
Accuracy: ±0.02 mm for cell placement and module stacking.
Resolution: 5 MP.
Defect Detection: AI-driven algorithms for welding, misalignment, and surface defects.
Data Logging: Inspection results stored for traceability.
Control System: Centralized PLC with decentralized modules for each station.
Human-Machine Interface (HMI):
15-inch touchscreen with multi-language support.
Real-time monitoring and troubleshooting.
IoT Connectivity:
Remote diagnostics, production tracking, and analytics via cloud integration.
Enclosures: Fully enclosed stations with interlocks.
Emergency Stops: Strategically placed across the line.
Laser Safety: Class 1 laser protection with certified viewing windows.
Overcurrent Protection: Built-in sensors to prevent electrical overloads.
Power Supply: AC 380V ± 10%, 50/60 Hz, 3-phase.
Maximum Power Consumption: 180 kW.
Control Voltage: 24V DC for auxiliary systems.
Type: Centralized water cooling for welding systems and power electronics.
Cooling Capacity: 60 kW.
Flow Rate: 20–40 L/min.
Operating Environment:
Temperature: 15–30°C.
Humidity: ≤60% RH (non-condensing).
Noise Level: ≤75 dB during operation.
Installation Space: Minimum clearance of 2,000 mm around the line.
Maintenance Schedule:
Weekly: Inspect welding systems, alignment mechanisms, and cooling systems.
Monthly: Calibrate vision and testing equipment.
Quarterly: Comprehensive diagnostics of the entire line.
Warranty Period:
Standard: 12 months.
Extended: Up to 36 months available upon request.
Cylindrical Battery Manufacture Line
Prismatic Battery Cap Manufacture Line
EV Cylindrical Battery Module PACK Assembly Lines
ESS Prismatic Battery Module PACK Assembly Line
EV Blade Battery CTP Automatic Welding Line
EV Prismatic Battery CTP Automatic Welding Line
EV Blade Battery Module PACK Line
EV Pouch Battery Module PACK Line
Email: info@huiyaolaser.com
Head Quarter Address: Huiyao Laser Technology, Building 2, Langxu Industrial Park, Guanlin Road, Science Park Street, Luolong District, Luoyang City, Henan Province, China
Research&Development Center: Room 901-9,Building B1, Phase 1, Southern Area, Baoneng Science and Technology Park, Qinghu Industrial Zone, Gangtou Community, Batian Street, Longgang District, Shenzhen City.
Hotline: Manager Ma
Sales Manager: +86-15002089356