A routing brief for visitors arriving from old laser-welding URLs. Use it to decide whether the inquiry should go to Huiyao Laser for equipment review, stay on YaoLaser for document preparation, or move to a project handoff request.
Why this old URL lands here
- Tab and terminal welding
- Busbar and collector welding
- Top cap, sealing pin, and safety vent welding
- Module and PACK welding stations
- Manual, semi-auto, and robotic workstation scope
What to prepare before routing
- Cell type and battery format
- Weld position and material stack
- Drawing or sample photos
- Target cycle time or UPH
- Automation level
- Inspection and traceability need
- Factory voltage/air/network standards
- Project country and timing
How YaoLaser decides the next destination
- 01Confirm cell format, weld position, material stack, and drawing tolerance.
- 02Select fixture, laser source, beam delivery, vision, and motion configuration.
- 03Validate weld strength, heat input, spatter control, and appearance criteria.
- 04Define inspection, traceability, and line-integration requirements before RFQ.
Questions to clarify before the specialist site
- Joint access, clamping stability, and part variation can change weld quality more than laser power alone.
- Battery welding projects should specify material combination, nickel/aluminum/copper thickness, allowable heat affected zone, and required test method.
- Sample validation should include pull test, sectioning, electrical resistance, and appearance criteria where relevant.