Testing and quality

OCV testing checkpoints for cell and PACK production

A technical note for test timing, data traceability, sorting logic, station placement, and acceptance reporting.

Battery production test station viewed from the operator side
Document objective

What this file should help verify

Help quality and automation teams decide where OCV testing sits in cell, module, and PACK workflows and what data must be accepted.

  1. Where OCV checks sit in cell, module, and PACK workflows.
  2. Sorting, NG handling, and traceability data buyers should clarify.
  3. Calibration and reporting evidence before FAT signoff.
Process checkpoints

Use the file to review these engineering decisions.

01

Define whether OCV is used for incoming cells, module grading, PACK confirmation, or final shipment evidence.

02

Specify data export fields, MES linkage, NG handling, calibration cycle, and operator review responsibility.

03

Ask for sample reports and station repeatability records before FAT signoff.

RFQ fields

Prepare these inputs before contacting a supplier.

  • Voltage range
  • Test timing
  • Data export fields
  • MES requirement
  • Sorting rule
  • Calibration record
Buyer FAQ

Questions this template should answer.

Is OCV a standalone station or a line-quality system?

It can be both. The key is whether the data supports sorting, traceability, and acceptance decisions, not only a pass/fail display.

What should buyers check in reports?

Timestamp, cell or module ID, voltage range, operator or station ID, NG reason, and export compatibility should be reviewed.