A routing brief for testing, inspection, aging, and EOL requirements. It helps decide whether the visitor needs a document set, equipment handoff, or broader project review.
Why this old URL lands here
- Capacity grading and performance test discussion
- Module and PACK EOL testing
- BMS, insulation, leak, and functional checks
- Aging, traceability, and data handoff planning
What to prepare before routing
- Product voltage/current range
- Module or PACK drawing
- Required test items
- Cycle time target
- Channel count
- Data/MES requirement
- Safety standard
- Acceptance report format
How YaoLaser decides the next destination
- 01Define what must be tested at cell, module, and PACK stages.
- 02Clarify test standards, cycle time, channel count, and data requirements.
- 03Connect test stations with line layout, MES, and acceptance reporting.
- 04Separate mandatory safety checks from optional diagnostic depth.
Questions to clarify before the specialist site
- Testing scope should match the product risk, not only the equipment catalog.
- Channel count, fixture contact, data traceability, and safety handling affect real throughput.
- A clear test plan prevents missed EOL requirements late in the project.